    Scheduled Pinned Locked Moved IT Discussion
    72 Posts 5 Posters 9.5k Views
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • dafyreD
      dafyre
      last edited by dafyre

      How about something like this?... Keep in mind, you'll need to code around blank boxes, etc...

      Dim myRange As Range
      
      Set myRange = Sheet1.Range("W1", "W5")
      
      For Each ritem In myRange
       msgbox (ritem.Value)
       
      Next
      

      In the Code Above, Sheet1 is the name of the worksheet. If the Sheet has a space in its name, you may have to get the Sheet1 object a different way.

      1 Reply Last reply Reply Quote 1
      • JaredBuschJ
        JaredBusch
        last edited by

        yeah, you need to look at the existing code and replace the bit that looks at the other sheet with something like what @dafyre gave you.

        1 Reply Last reply Reply Quote 0
        • garak0410G
          garak0410
          last edited by

          Here's the original Subroutine and Function it originally ran...as stated, want to rid the method of going to another sheet to pull job numbers by date and rather get them from column W and then it will continue to do the same arrays and calculations as it did before...

          Sub IMPORT_ALL_INFORMATION()

          'Set variables
          Dim file_in As Long
          Dim strInput As Variant
          Dim i As Integer
          Dim j As Integer
          Dim l As Integer
          Dim sTmp As String
          Dim sJob As String
          Dim sSchedPath As String

          'end setting variables
          Sheets("REPORT").Select
          Range("C2").Select

          sSchedPath = "C:\Temp"
          Call apiCopyFile("\servername\Applications\Schedule\schedule-s\schedule, S.xls", "C:\Temp\schedule, S.xls", 0)
          dteStart = Application.Sheets("Report").Range("$G$27").Value
          dteEnd = Application.Sheets("Report").Range("$J$27").Value
          l = 4 ' First data row of schedule, S.xls
          j = 2 ' First job row of Plate & Bar Spreadsheet
          Do Until CDate(GetDate(GetValue(sSchedPath, "schedule, S.xls", "LOG (2)", "N" & CStr(l)))) >= dteStart
          l = l + 1
          ' Changed from 754 to 854...may be total jobs for year...went close to 800 jobs this year . BAW
          If l = 854 Then
          MsgBox ("Hello")
          End If
          sTmp = Trim$(GetValue(sSchedPath, "schedule, S.xls", "LOG (2)", "N" & CStr(l)))
          If sTmp = "0" Or Len(sTmp) = 0 Or sTmp = "HOLIDAY" Then
          l = l + 1
          End If
          Loop
          Do
          sJob = ParseJob(GetValue(sSchedPath, "schedule, S.xls", "LOG (2)", "B" & CStr(l)))
          ' Debug.Print sJob
          vJobFolders = Split(FindJobDir(strpathtofile & sJob), ",")
          For i = 0 To UBound(vJobFolders)
          On Error GoTo ErrorExit
          Application.Sheets("report").Range("C" & CStr(j)).Value = vJobFolders(i)
          j = j + 1
          file_in = FreeFile 'file number
          strFileToOpen = strpathtofile & vJobFolders(i) & strFilename
          If Dir(strFileToOpen) <> "" Then
          Open strFileToOpen For Input As #file_in
          Put_Data_In_Array (file_in)
          Organize_Array_For_Print
          Close #file_in ' close the file
          End If
          ErrorExit:
          Next i
          l = l + 1
          sTmp = Trim$(GetValue(sSchedPath, "schedule, S.xls", "LOG (2)", "N" & CStr(l)))
          If sTmp = "0" Or Len(sTmp) = 0 Or sTmp = "HOLIDAY" Then
          l = l + 1
          End If
          Loop Until CDate(GetDate(sTmp)) >= dteEnd
          Sheets("REPORT").Select

          End Sub

          Function GetValue(path, file, sheet, ref) As String
          ' Retrieves a value from a closed workbook
          Dim arg As String
          Dim pos As Integer
          ' Make sure the file exists
          If Right(path, 1) <> "" Then path = path & ""
          If Dir(path & file) = "" Then
          GetValue = "File Not Found"
          Exit Function
          End If
          ' Create the argument
          arg = "'" & path & "[" & file & "]" & sheet & "'!" & _
          Range(ref).Range("A1").Address(, , xlR1C1)
          ' Execute an XLM macro
          GetValue = ExecuteExcel4Macro(arg)
          ' Strip Any time from beginning of Date string
          pos = InStr(GetValue, ":")
          If pos <> 0 Then GetValue = Mid$(GetValue, pos + 3)
          End Function

          1 Reply Last reply Reply Quote 0
          • thwrT
            thwr
            last edited by thwr

            Easier to read:

            Sub IMPORT_ALL_INFORMATION()
                REM Set variables
                Dim file_in As Long
                Dim strInput As Variant
                Dim i As Integer
                Dim j As Integer
                Dim l As Integer
                Dim sTmp As String
                Dim sJob As String
                Dim sSchedPath As String
            
                REM end setting variables
                Sheets("REPORT").Select
                Range("C2").Select
            
                sSchedPath = "C:\Temp"
                Call apiCopyFile("\servername\Applications\Schedule\schedule-s\schedule, S.xls", "C:\Temp\schedule, S.xls", 0)
                dteStart = Application.Sheets("Report").Range("$G$27").Value
                dteEnd = Application.Sheets("Report").Range("$J$27").Value
                
                REM    First data row of schedule, S.xls
                l = 4 
                
                REM    First job row of Plate & Bar Spreadsheet
                j = 2 
            
                Do Until CDate(GetDate(GetValue(sSchedPath, "schedule, S.xls", "LOG (2)", "N" & CStr(l)))) >= dteStart
                    l = l + 1
                    
                    REM    Changed from 754 to 854...may be total jobs for year...went close to 800 jobs this year . BAW
                    If l = 854 Then
                        MsgBox ("Hello")
                    End If
            
                    sTmp = Trim$(GetValue(sSchedPath, "schedule, S.xls", "LOG (2)", "N" & CStr(l)))
            
                    If sTmp = "0" Or Len(sTmp) = 0 Or sTmp = "HOLIDAY" Then
                        l = l + 1
                    End If
                Loop
            
                Do
                    sJob = ParseJob(GetValue(sSchedPath, "schedule, S.xls", "LOG (2)", "B" & CStr(l)))
                    REM    Debug.Print sJob
                    vJobFolders = Split(FindJobDir(strpathtofile & sJob), ",")
                    For i = 0 To UBound(vJobFolders)
                        On Error GoTo ErrorExit
                        Application.Sheets("report").Range("C" & CStr(j)).Value = vJobFolders(i)
                        j = j + 1
                        
                        REM file number
                        file_in = FreeFile 
                        
                        strFileToOpen = strpathtofile & vJobFolders(i) & strFilename
            
                        If Dir(strFileToOpen) <> "" Then
                            Open strFileToOpen For Input As #file_in
                            Put_Data_In_Array (file_in)
                            Organize_Array_For_Print
                            Close #file_in REM    close the file
                        End If
                        ErrorExit:
            
                    Next i
            
                    l = l + 1
                    sTmp = Trim$(GetValue(sSchedPath, "schedule, S.xls", "LOG (2)", "N" & CStr(l)))
                    If sTmp = "0" Or Len(sTmp) = 0 Or sTmp = "HOLIDAY" Then
                        l = l + 1
                    End If
                    
                Loop Until CDate(GetDate(sTmp)) >= dteEnd
                Sheets("REPORT").Select
            
            End Sub
            
            Function GetValue(path, file, sheet, ref) As String
                REM    Retrieves a value from a closed workbook
                Dim arg As String
                Dim pos As Integer
                
                REM    Make sure the file exists
                If Right(path, 1) <> "" Then 
                    path = path & ""
                End If
                
                If Dir(path & file) = "" Then
                    GetValue = "File Not Found"
                    Exit Function
                End If
                
                REM    Create the argument
                arg = "REM " & path & "[" & file & "]" & sheet & "REM !" & _
                Range(ref).Range("A1").Address(, , xlR1C1)
                REM    Execute an XLM macro
                GetValue = ExecuteExcel4Macro(arg)
                REM    Strip Any time from beginning of Date string
                pos = InStr(GetValue, ":")
                If pos <> 0 Then GetValue = Mid$(GetValue, pos + 3)
            End Function
            
            1 Reply Last reply Reply Quote 0
            • thwrT
              thwr
              last edited by

              @garak0410 Just don't know how to tell it, with VBA, to take each job number in column W and do what it normally did the other way and then put a warning up if it doesn't match exactly and to STOP when it teaches a null cell.

              Little helper function

              Function IsNullOrEmpty(val as String) as Boolean
                REM Strings are always initialized as "" in VB/VBA/VBS, so checking for Null is redundant. At least In theory.
                If (val is Null or val = "") Then
                  IsNullOrEmpty = True
                Else
                  IsNullOrEmpty = False
                End If
              End Function
              

              To process your values (like @dafyre suggested):

              Dim myRange As Range
              
              Set myRange = Sheet1.Range("W1", "W5")
              
              For Each ritem In myRange
                If (IsNullOrEmpty(ritem.Value)) Then 
                  REM Empty string, processing finished
                  Exit For
                Else
                  REM Do something here with ritem.Value
                End If
              Next
              

              The original script is a bit... ugly. Could be easier to have the XLS with test data only.

              1 Reply Last reply Reply Quote 0
              • garak0410G
                garak0410
                last edited by

                Maybe I am just thinking a little simplistic, but was thinking that this could be all I need, after commenting out the code that goes to the other sheet:

                sJob = Report.Range("W2:W50").Select(CStr(l))

                But alas, it doesn't work...

                garak0410G 1 Reply Last reply Reply Quote 0
                • garak0410G
                  garak0410 @garak0410
                  last edited by

                  @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                  Maybe I am just thinking a little simplistic, but was thinking that this could be all I need, after commenting out the code that goes to the other sheet:

                  sJob = Report.Range("W2:W50").Select(CStr(l))

                  But alas, it doesn't work...

                  I am going to play around with variations of this but each time I change something, new errors (mostly syntax) pop up...it is maddening.

                  dafyreD 1 Reply Last reply Reply Quote 0
                  • dafyreD
                    dafyre @garak0410
                    last edited by

                    @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                    @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                    Maybe I am just thinking a little simplistic, but was thinking that this could be all I need, after commenting out the code that goes to the other sheet:

                    sJob = Report.Range("W2:W50").Select(CStr(l))

                    But alas, it doesn't work...

                    I am going to play around with variations of this but each time I change something, new errors (mostly syntax) pop up...it is maddening.

                    Welcome to the world of software devleopment, lol.

                    @thwr is right. I'd take a little while to clean up the code and make it more readable (see his code post)... and then go back to make your changes.

                    Are all of these jobs separated out into their own Excel files (or are they some other type of file that we don't care about?)

                    garak0410G 1 Reply Last reply Reply Quote 1
                    • garak0410G
                      garak0410 @dafyre
                      last edited by

                      @dafyre said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                      @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                      @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                      Maybe I am just thinking a little simplistic, but was thinking that this could be all I need, after commenting out the code that goes to the other sheet:

                      sJob = Report.Range("W2:W50").Select(CStr(l))

                      But alas, it doesn't work...

                      I am going to play around with variations of this but each time I change something, new errors (mostly syntax) pop up...it is maddening.

                      Welcome to the world of software devleopment, lol.

                      @thwr is right. I'd take a little while to clean up the code and make it more readable (see his code post)... and then go back to make your changes.

                      Are all of these jobs separated out into their own Excel files (or are they some other type of file that we don't care about?)

                      The "jobs" are metal building jobs that are in folders on a network share. The folders the "job numbers." When searching for these jobs, it goes out to these job folders, finds a file called o PltSum.out and then takes that data and calculates the needed materials to order for the week. That calculation isn't my focus as that should still work if I get this to work differently.

                      garak0410G 1 Reply Last reply Reply Quote 0
                      • garak0410G
                        garak0410 @garak0410
                        last edited by

                        In my weeks long struggle with this, I did at least try somethiing...I commented out all of the lines that grabbed the data from the other sheet (see code in posts above) and made a varient called rcell and tried this line of code:

                        For Each rcell In Worksheets("Sheet1").Range("W2:W50"): Debug.Print rcell.Value: Next rcell
                        sJob = rcell.Value

                        I keep getting SUBSCRIPT OUT OF RANGE.

                        I guess this is a lack of my own education mixed with bad coding in the first place...

                        dafyreD 1 Reply Last reply Reply Quote 0
                        • dafyreD
                          dafyre @garak0410
                          last edited by

                          @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                          In my weeks long struggle with this, I did at least try somethiing...I commented out all of the lines that grabbed the data from the other sheet (see code in posts above) and made a varient called rcell and tried this line of code:

                          For Each rcell In Worksheets("Sheet1").Range("W2:W50"): Debug.Print rcell.Value: Next rcell
                          sJob = rcell.Value

                          I keep getting SUBSCRIPT OUT OF RANGE.

                          I guess this is a lack of my own education mixed with bad coding in the first place...

                          A little formatting my help you see the problem...

                          For Each rcell In Worksheets("Sheet1").Range("W2:W50")
                           Debug.Print rcell.Value: 
                          Next rcell
                          
                          sJob = rcell.Value
                          

                          It looks like you're trying to assing sJob after you come out of the For Each loop... Try:

                          For Each rcell In Worksheets("Sheet1").Range("W2:W50")
                           Debug.Print rcell.Value: 
                           sJob = rcell.Value
                          
                          Next rcell
                          
                          garak0410G 1 Reply Last reply Reply Quote 1
                          • garak0410G
                            garak0410 @dafyre
                            last edited by

                            @dafyre said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                            @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                            In my weeks long struggle with this, I did at least try somethiing...I commented out all of the lines that grabbed the data from the other sheet (see code in posts above) and made a varient called rcell and tried this line of code:

                            For Each rcell In Worksheets("Sheet1").Range("W2:W50"): Debug.Print rcell.Value: Next rcell
                            sJob = rcell.Value

                            I keep getting SUBSCRIPT OUT OF RANGE.

                            I guess this is a lack of my own education mixed with bad coding in the first place...

                            A little formatting my help you see the problem...

                            For Each rcell In Worksheets("Sheet1").Range("W2:W50")
                             Debug.Print rcell.Value: 
                            Next rcell
                            
                            sJob = rcell.Value
                            

                            It looks like you're trying to assing sJob after you come out of the For Each loop... Try:

                            For Each rcell In Worksheets("Sheet1").Range("W2:W50")
                             Debug.Print rcell.Value: 
                             sJob = rcell.Value
                            
                            Next rcell
                            

                            OK...I am giving this a shot...I am at the point in the old code where I see when SJOB is equal to the value of the job on the date range on the other spreadsheet. Since I am moving these jobs to manually entered job numbers in Column W, will se how this works. Curretly, SJOB is equal to: sJob = ParseJob(GetValue(sSchedPath, "Schedule S.xls", "LOG (2)", "B" & CStr(l)))

                            dafyreD 1 Reply Last reply Reply Quote 0
                            • dafyreD
                              dafyre @garak0410
                              last edited by

                              @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                              @dafyre said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                              @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                              In my weeks long struggle with this, I did at least try somethiing...I commented out all of the lines that grabbed the data from the other sheet (see code in posts above) and made a varient called rcell and tried this line of code:

                              For Each rcell In Worksheets("Sheet1").Range("W2:W50"): Debug.Print rcell.Value: Next rcell
                              sJob = rcell.Value

                              I keep getting SUBSCRIPT OUT OF RANGE.

                              I guess this is a lack of my own education mixed with bad coding in the first place...

                              A little formatting my help you see the problem...

                              For Each rcell In Worksheets("Sheet1").Range("W2:W50")
                               Debug.Print rcell.Value: 
                              Next rcell
                              
                              sJob = rcell.Value
                              

                              It looks like you're trying to assing sJob after you come out of the For Each loop... Try:

                              For Each rcell In Worksheets("Sheet1").Range("W2:W50")
                               Debug.Print rcell.Value: 
                               sJob = rcell.Value
                              
                              Next rcell
                              

                              OK...I am giving this a shot...I am at the point in the old code where I see when SJOB is equal to the value of the job on the date range on the other spreadsheet. Since I am moving these jobs to manually entered job numbers in Column W, will se how this works. Curretly, SJOB is equal to: sJob = ParseJob(GetValue(sSchedPath, "Schedule S.xls", "LOG (2)", "B" & CStr(l)))

                              sJob=ParaseJob(rcell.value) ?

                              garak0410G 1 Reply Last reply Reply Quote 0
                              • garak0410G
                                garak0410 @dafyre
                                last edited by

                                @dafyre said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                                @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                                @dafyre said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                                @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                                In my weeks long struggle with this, I did at least try somethiing...I commented out all of the lines that grabbed the data from the other sheet (see code in posts above) and made a varient called rcell and tried this line of code:

                                For Each rcell In Worksheets("Sheet1").Range("W2:W50"): Debug.Print rcell.Value: Next rcell
                                sJob = rcell.Value

                                I keep getting SUBSCRIPT OUT OF RANGE.

                                I guess this is a lack of my own education mixed with bad coding in the first place...

                                A little formatting my help you see the problem...

                                For Each rcell In Worksheets("Sheet1").Range("W2:W50")
                                 Debug.Print rcell.Value: 
                                Next rcell
                                
                                sJob = rcell.Value
                                

                                It looks like you're trying to assing sJob after you come out of the For Each loop... Try:

                                For Each rcell In Worksheets("Sheet1").Range("W2:W50")
                                 Debug.Print rcell.Value: 
                                 sJob = rcell.Value
                                
                                Next rcell
                                

                                OK...I am giving this a shot...I am at the point in the old code where I see when SJOB is equal to the value of the job on the date range on the other spreadsheet. Since I am moving these jobs to manually entered job numbers in Column W, will se how this works. Curretly, SJOB is equal to: sJob = ParseJob(GetValue(sSchedPath, "Schedule S.xls", "LOG (2)", "B" & CStr(l)))

                                sJob=ParaseJob(rcell.value) ?

                                The more I work on this (uninterrupted from day to day issues that I am NOT getting today, wooo!), the more I think I am "getting it."...I don't think we need ParseJob because what that did before was remove spaces in the job numbers that were lisited on Schedule, S. So I just need it to be rcell.value...about to code and see what happens.

                                dafyreD 1 Reply Last reply Reply Quote 0
                                • dafyreD
                                  dafyre @garak0410
                                  last edited by

                                  @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                                  @dafyre said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                                  @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                                  @dafyre said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                                  @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                                  In my weeks long struggle with this, I did at least try somethiing...I commented out all of the lines that grabbed the data from the other sheet (see code in posts above) and made a varient called rcell and tried this line of code:

                                  For Each rcell In Worksheets("Sheet1").Range("W2:W50"): Debug.Print rcell.Value: Next rcell
                                  sJob = rcell.Value

                                  I keep getting SUBSCRIPT OUT OF RANGE.

                                  I guess this is a lack of my own education mixed with bad coding in the first place...

                                  A little formatting my help you see the problem...

                                  For Each rcell In Worksheets("Sheet1").Range("W2:W50")
                                   Debug.Print rcell.Value: 
                                  Next rcell
                                  
                                  sJob = rcell.Value
                                  

                                  It looks like you're trying to assing sJob after you come out of the For Each loop... Try:

                                  For Each rcell In Worksheets("Sheet1").Range("W2:W50")
                                   Debug.Print rcell.Value: 
                                   sJob = rcell.Value
                                  
                                  Next rcell
                                  

                                  OK...I am giving this a shot...I am at the point in the old code where I see when SJOB is equal to the value of the job on the date range on the other spreadsheet. Since I am moving these jobs to manually entered job numbers in Column W, will se how this works. Curretly, SJOB is equal to: sJob = ParseJob(GetValue(sSchedPath, "Schedule S.xls", "LOG (2)", "B" & CStr(l)))

                                  sJob=ParaseJob(rcell.value) ?

                                  The more I work on this (uninterrupted from day to day issues that I am NOT getting today, wooo!), the more I think I am "getting it."...I don't think we need ParseJob because what that did before was remove spaces in the job numbers that were lisited on Schedule, S. So I just need it to be rcell.value...about to code and see what happens.

                                  puts on hard hat...

                                  Here... Hold my beer?

                                  garak0410G 1 Reply Last reply Reply Quote 1
                                  • garak0410G
                                    garak0410 @dafyre
                                    last edited by

                                    @dafyre said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                                    @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                                    @dafyre said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                                    @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                                    @dafyre said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                                    @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                                    In my weeks long struggle with this, I did at least try somethiing...I commented out all of the lines that grabbed the data from the other sheet (see code in posts above) and made a varient called rcell and tried this line of code:

                                    For Each rcell In Worksheets("Sheet1").Range("W2:W50"): Debug.Print rcell.Value: Next rcell
                                    sJob = rcell.Value

                                    I keep getting SUBSCRIPT OUT OF RANGE.

                                    I guess this is a lack of my own education mixed with bad coding in the first place...

                                    A little formatting my help you see the problem...

                                    For Each rcell In Worksheets("Sheet1").Range("W2:W50")
                                     Debug.Print rcell.Value: 
                                    Next rcell
                                    
                                    sJob = rcell.Value
                                    

                                    It looks like you're trying to assing sJob after you come out of the For Each loop... Try:

                                    For Each rcell In Worksheets("Sheet1").Range("W2:W50")
                                     Debug.Print rcell.Value: 
                                     sJob = rcell.Value
                                    
                                    Next rcell
                                    

                                    OK...I am giving this a shot...I am at the point in the old code where I see when SJOB is equal to the value of the job on the date range on the other spreadsheet. Since I am moving these jobs to manually entered job numbers in Column W, will se how this works. Curretly, SJOB is equal to: sJob = ParseJob(GetValue(sSchedPath, "Schedule S.xls", "LOG (2)", "B" & CStr(l)))

                                    sJob=ParaseJob(rcell.value) ?

                                    The more I work on this (uninterrupted from day to day issues that I am NOT getting today, wooo!), the more I think I am "getting it."...I don't think we need ParseJob because what that did before was remove spaces in the job numbers that were lisited on Schedule, S. So I just need it to be rcell.value...about to code and see what happens.

                                    puts on hard hat...

                                    Here... Hold my beer?

                                    Funny...it is amazing what a closed door and no distractions can do to your focus and clarity...and maybe "beer."... 🙂

                                    dafyreD 1 Reply Last reply Reply Quote 0
                                    • dafyreD
                                      dafyre @garak0410
                                      last edited by

                                      @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                                      @dafyre said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                                      @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                                      @dafyre said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                                      @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                                      @dafyre said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                                      @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                                      In my weeks long struggle with this, I did at least try somethiing...I commented out all of the lines that grabbed the data from the other sheet (see code in posts above) and made a varient called rcell and tried this line of code:

                                      For Each rcell In Worksheets("Sheet1").Range("W2:W50"): Debug.Print rcell.Value: Next rcell
                                      sJob = rcell.Value

                                      I keep getting SUBSCRIPT OUT OF RANGE.

                                      I guess this is a lack of my own education mixed with bad coding in the first place...

                                      A little formatting my help you see the problem...

                                      For Each rcell In Worksheets("Sheet1").Range("W2:W50")
                                       Debug.Print rcell.Value: 
                                      Next rcell
                                      
                                      sJob = rcell.Value
                                      

                                      It looks like you're trying to assing sJob after you come out of the For Each loop... Try:

                                      For Each rcell In Worksheets("Sheet1").Range("W2:W50")
                                       Debug.Print rcell.Value: 
                                       sJob = rcell.Value
                                      
                                      Next rcell
                                      

                                      OK...I am giving this a shot...I am at the point in the old code where I see when SJOB is equal to the value of the job on the date range on the other spreadsheet. Since I am moving these jobs to manually entered job numbers in Column W, will se how this works. Curretly, SJOB is equal to: sJob = ParseJob(GetValue(sSchedPath, "Schedule S.xls", "LOG (2)", "B" & CStr(l)))

                                      sJob=ParaseJob(rcell.value) ?

                                      The more I work on this (uninterrupted from day to day issues that I am NOT getting today, wooo!), the more I think I am "getting it."...I don't think we need ParseJob because what that did before was remove spaces in the job numbers that were lisited on Schedule, S. So I just need it to be rcell.value...about to code and see what happens.

                                      puts on hard hat...

                                      Here... Hold my beer?

                                      Funny...it is amazing what a closed door and no distractions can do to your focus and clarity...and maybe "beer."... 🙂

                                      Is debug.print rCell.value showing anything in the immediate window (CTRL G or View -> Immediate window) ?

                                      1 Reply Last reply Reply Quote 0
                                      • garak0410G
                                        garak0410 @Guest
                                        last edited by

                                        @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                                        I'm making progress even if still getting errors...

                                        I did put job numbers in rows W2 and W3. SJOB is still a null value even after this:

                                        For Each rCell In Worksheets("REPORT").Range("W2:W50")
                                        Debug.Print rCell.Value:
                                        sJob = rCell.Value
                                        Next rCell

                                        And some how, it is still pulling data from Schedule, S and putting it in Column C...I am trying to track that down...

                                        While debugging, it DOES pull from column W and I see SJOB being assigned a job number both by hovering over the variable and in the intermediate window. It then does the same for the next job number (only entered two for this example, cell W2 and W3. The intermediate Window does show both jobs:

                                        0_1465916853111_vba10.jpg

                                        But it is not holding the SJOB data as it eventually goes null...

                                        When it gets to this part:

                                        Function FindJobDir(ByVal strPath As String) As String
                                        Dim sResult As String

                                        sResult = Dir(strPath & "*", vbDirectory)
                                        FindJobDir = UCase$(sResult)
                                        Do While sResult <> ""
                                        sResult = Dir
                                        If Len(sResult) > 0 Then FindJobDir = FindJobDir & "," & UCase$(sResult)
                                        Loop
                                        End Function

                                        It just starts grabbing all job folder information from the server location...luckily it fails when it hits a ZIP folder otherwise it would have been a data overrun...

                                        When it is executing this line: vJobFolders = Split(FindJobDir(strpathtofile & sJob), ",")

                                        SJOB Shows Null like this:

                                        0_1465917979827_vba11.jpg

                                        1 Reply Last reply Reply Quote 0
                                        • dafyreD
                                          dafyre
                                          last edited by

                                          That is right. The way the code works, is it just prints the rcell.value to the screen, sets SJOB =rcell.value, and then at the Next rCell line, it goes to the next cell. It's not actually doing anything beneath that.

                                          The trick will be to comment out the "Next rCell" line

                                          and find out where the end of the process is, and then on the next line add next rCell and see if that works.

                                          If this thing is actively modifying files and such, I'd hightly recommend backing everything up before running it while you are working on that part. 🙂

                                          garak0410G 1 Reply Last reply Reply Quote 0
                                          • garak0410G
                                            garak0410 @dafyre
                                            last edited by

                                            @dafyre said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                                            That is right. The way the code works, is it just prints the rcell.value to the screen, sets SJOB =rcell.value, and then at the Next rCell line, it goes to the next cell. It's not actually doing anything beneath that.

                                            The trick will be to comment out the "Next rCell" line

                                            and find out where the end of the process is, and then on the next line add next rCell and see if that works.

                                            If this thing is actively modifying files and such, I'd hightly recommend backing everything up before running it while you are working on that part. 🙂

                                            Question...if I comment out the Next rCell line to test this, then what do I do with the FOR line? It will tell me there is a FOR without a NEXT.