      thwr
      last edited by

      @garak0410 Just don't know how to tell it, with VBA, to take each job number in column W and do what it normally did the other way and then put a warning up if it doesn't match exactly and to STOP when it teaches a null cell.

      Little helper function

      Function IsNullOrEmpty(val as String) as Boolean
        REM Strings are always initialized as "" in VB/VBA/VBS, so checking for Null is redundant. At least In theory.
        If (val is Null or val = "") Then
          IsNullOrEmpty = True
        Else
          IsNullOrEmpty = False
        End If
      End Function
      

      To process your values (like @dafyre suggested):

      Dim myRange As Range
      
      Set myRange = Sheet1.Range("W1", "W5")
      
      For Each ritem In myRange
        If (IsNullOrEmpty(ritem.Value)) Then 
          REM Empty string, processing finished
          Exit For
        Else
          REM Do something here with ritem.Value
        End If
      Next
      

      The original script is a bit... ugly. Could be easier to have the XLS with test data only.

      1 Reply Last reply Reply Quote 0
      • garak0410G
        garak0410
        last edited by

        Maybe I am just thinking a little simplistic, but was thinking that this could be all I need, after commenting out the code that goes to the other sheet:

        sJob = Report.Range("W2:W50").Select(CStr(l))

        But alas, it doesn't work...

        garak0410G 1 Reply Last reply Reply Quote 0
        • garak0410G
          garak0410 @garak0410
          last edited by

          @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

          Maybe I am just thinking a little simplistic, but was thinking that this could be all I need, after commenting out the code that goes to the other sheet:

          sJob = Report.Range("W2:W50").Select(CStr(l))

          But alas, it doesn't work...

          I am going to play around with variations of this but each time I change something, new errors (mostly syntax) pop up...it is maddening.

          dafyreD 1 Reply Last reply Reply Quote 0
          • dafyreD
            dafyre @garak0410
            last edited by

            @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

            @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

            Maybe I am just thinking a little simplistic, but was thinking that this could be all I need, after commenting out the code that goes to the other sheet:

            sJob = Report.Range("W2:W50").Select(CStr(l))

            But alas, it doesn't work...

            I am going to play around with variations of this but each time I change something, new errors (mostly syntax) pop up...it is maddening.

            Welcome to the world of software devleopment, lol.

            @thwr is right. I'd take a little while to clean up the code and make it more readable (see his code post)... and then go back to make your changes.

            Are all of these jobs separated out into their own Excel files (or are they some other type of file that we don't care about?)

            garak0410G 1 Reply Last reply Reply Quote 1
            • garak0410G
              garak0410 @dafyre
              last edited by

              @dafyre said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

              @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

              @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

              Maybe I am just thinking a little simplistic, but was thinking that this could be all I need, after commenting out the code that goes to the other sheet:

              sJob = Report.Range("W2:W50").Select(CStr(l))

              But alas, it doesn't work...

              I am going to play around with variations of this but each time I change something, new errors (mostly syntax) pop up...it is maddening.

              Welcome to the world of software devleopment, lol.

              @thwr is right. I'd take a little while to clean up the code and make it more readable (see his code post)... and then go back to make your changes.

              Are all of these jobs separated out into their own Excel files (or are they some other type of file that we don't care about?)

              The "jobs" are metal building jobs that are in folders on a network share. The folders the "job numbers." When searching for these jobs, it goes out to these job folders, finds a file called o PltSum.out and then takes that data and calculates the needed materials to order for the week. That calculation isn't my focus as that should still work if I get this to work differently.

              garak0410G 1 Reply Last reply Reply Quote 0
              • garak0410G
                garak0410 @garak0410
                last edited by

                In my weeks long struggle with this, I did at least try somethiing...I commented out all of the lines that grabbed the data from the other sheet (see code in posts above) and made a varient called rcell and tried this line of code:

                For Each rcell In Worksheets("Sheet1").Range("W2:W50"): Debug.Print rcell.Value: Next rcell
                sJob = rcell.Value

                I keep getting SUBSCRIPT OUT OF RANGE.

                I guess this is a lack of my own education mixed with bad coding in the first place...

                dafyreD 1 Reply Last reply Reply Quote 0
                • dafyreD
                  dafyre @garak0410
                  last edited by

                  @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                  In my weeks long struggle with this, I did at least try somethiing...I commented out all of the lines that grabbed the data from the other sheet (see code in posts above) and made a varient called rcell and tried this line of code:

                  For Each rcell In Worksheets("Sheet1").Range("W2:W50"): Debug.Print rcell.Value: Next rcell
                  sJob = rcell.Value

                  I keep getting SUBSCRIPT OUT OF RANGE.

                  I guess this is a lack of my own education mixed with bad coding in the first place...

                  A little formatting my help you see the problem...

                  For Each rcell In Worksheets("Sheet1").Range("W2:W50")
                   Debug.Print rcell.Value: 
                  Next rcell
                  
                  sJob = rcell.Value
                  

                  It looks like you're trying to assing sJob after you come out of the For Each loop... Try:

                  For Each rcell In Worksheets("Sheet1").Range("W2:W50")
                   Debug.Print rcell.Value: 
                   sJob = rcell.Value
                  
                  Next rcell
                  
                  garak0410G 1 Reply Last reply Reply Quote 1
                  • garak0410G
                    garak0410 @dafyre
                    last edited by

                    @dafyre said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                    @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                    In my weeks long struggle with this, I did at least try somethiing...I commented out all of the lines that grabbed the data from the other sheet (see code in posts above) and made a varient called rcell and tried this line of code:

                    For Each rcell In Worksheets("Sheet1").Range("W2:W50"): Debug.Print rcell.Value: Next rcell
                    sJob = rcell.Value

                    I keep getting SUBSCRIPT OUT OF RANGE.

                    I guess this is a lack of my own education mixed with bad coding in the first place...

                    A little formatting my help you see the problem...

                    For Each rcell In Worksheets("Sheet1").Range("W2:W50")
                     Debug.Print rcell.Value: 
                    Next rcell
                    
                    sJob = rcell.Value
                    

                    It looks like you're trying to assing sJob after you come out of the For Each loop... Try:

                    For Each rcell In Worksheets("Sheet1").Range("W2:W50")
                     Debug.Print rcell.Value: 
                     sJob = rcell.Value
                    
                    Next rcell
                    

                    OK...I am giving this a shot...I am at the point in the old code where I see when SJOB is equal to the value of the job on the date range on the other spreadsheet. Since I am moving these jobs to manually entered job numbers in Column W, will se how this works. Curretly, SJOB is equal to: sJob = ParseJob(GetValue(sSchedPath, "Schedule S.xls", "LOG (2)", "B" & CStr(l)))

                    dafyreD 1 Reply Last reply Reply Quote 0
                    • dafyreD
                      dafyre @garak0410
                      last edited by

                      @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                      @dafyre said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                      @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                      In my weeks long struggle with this, I did at least try somethiing...I commented out all of the lines that grabbed the data from the other sheet (see code in posts above) and made a varient called rcell and tried this line of code:

                      For Each rcell In Worksheets("Sheet1").Range("W2:W50"): Debug.Print rcell.Value: Next rcell
                      sJob = rcell.Value

                      I keep getting SUBSCRIPT OUT OF RANGE.

                      I guess this is a lack of my own education mixed with bad coding in the first place...

                      A little formatting my help you see the problem...

                      For Each rcell In Worksheets("Sheet1").Range("W2:W50")
                       Debug.Print rcell.Value: 
                      Next rcell
                      
                      sJob = rcell.Value
                      

                      It looks like you're trying to assing sJob after you come out of the For Each loop... Try:

                      For Each rcell In Worksheets("Sheet1").Range("W2:W50")
                       Debug.Print rcell.Value: 
                       sJob = rcell.Value
                      
                      Next rcell
                      

                      OK...I am giving this a shot...I am at the point in the old code where I see when SJOB is equal to the value of the job on the date range on the other spreadsheet. Since I am moving these jobs to manually entered job numbers in Column W, will se how this works. Curretly, SJOB is equal to: sJob = ParseJob(GetValue(sSchedPath, "Schedule S.xls", "LOG (2)", "B" & CStr(l)))

                      sJob=ParaseJob(rcell.value) ?

                      garak0410G 1 Reply Last reply Reply Quote 0
                      • garak0410G
                        garak0410 @dafyre
                        last edited by

                        @dafyre said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                        @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                        @dafyre said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                        @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                        In my weeks long struggle with this, I did at least try somethiing...I commented out all of the lines that grabbed the data from the other sheet (see code in posts above) and made a varient called rcell and tried this line of code:

                        For Each rcell In Worksheets("Sheet1").Range("W2:W50"): Debug.Print rcell.Value: Next rcell
                        sJob = rcell.Value

                        I keep getting SUBSCRIPT OUT OF RANGE.

                        I guess this is a lack of my own education mixed with bad coding in the first place...

                        A little formatting my help you see the problem...

                        For Each rcell In Worksheets("Sheet1").Range("W2:W50")
                         Debug.Print rcell.Value: 
                        Next rcell
                        
                        sJob = rcell.Value
                        

                        It looks like you're trying to assing sJob after you come out of the For Each loop... Try:

                        For Each rcell In Worksheets("Sheet1").Range("W2:W50")
                         Debug.Print rcell.Value: 
                         sJob = rcell.Value
                        
                        Next rcell
                        

                        OK...I am giving this a shot...I am at the point in the old code where I see when SJOB is equal to the value of the job on the date range on the other spreadsheet. Since I am moving these jobs to manually entered job numbers in Column W, will se how this works. Curretly, SJOB is equal to: sJob = ParseJob(GetValue(sSchedPath, "Schedule S.xls", "LOG (2)", "B" & CStr(l)))

                        sJob=ParaseJob(rcell.value) ?

                        The more I work on this (uninterrupted from day to day issues that I am NOT getting today, wooo!), the more I think I am "getting it."...I don't think we need ParseJob because what that did before was remove spaces in the job numbers that were lisited on Schedule, S. So I just need it to be rcell.value...about to code and see what happens.

                        dafyreD 1 Reply Last reply Reply Quote 0
                        • dafyreD
                          dafyre @garak0410
                          last edited by

                          @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                          @dafyre said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                          @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                          @dafyre said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                          @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                          In my weeks long struggle with this, I did at least try somethiing...I commented out all of the lines that grabbed the data from the other sheet (see code in posts above) and made a varient called rcell and tried this line of code:

                          For Each rcell In Worksheets("Sheet1").Range("W2:W50"): Debug.Print rcell.Value: Next rcell
                          sJob = rcell.Value

                          I keep getting SUBSCRIPT OUT OF RANGE.

                          I guess this is a lack of my own education mixed with bad coding in the first place...

                          A little formatting my help you see the problem...

                          For Each rcell In Worksheets("Sheet1").Range("W2:W50")
                           Debug.Print rcell.Value: 
                          Next rcell
                          
                          sJob = rcell.Value
                          

                          It looks like you're trying to assing sJob after you come out of the For Each loop... Try:

                          For Each rcell In Worksheets("Sheet1").Range("W2:W50")
                           Debug.Print rcell.Value: 
                           sJob = rcell.Value
                          
                          Next rcell
                          

                          OK...I am giving this a shot...I am at the point in the old code where I see when SJOB is equal to the value of the job on the date range on the other spreadsheet. Since I am moving these jobs to manually entered job numbers in Column W, will se how this works. Curretly, SJOB is equal to: sJob = ParseJob(GetValue(sSchedPath, "Schedule S.xls", "LOG (2)", "B" & CStr(l)))

                          sJob=ParaseJob(rcell.value) ?

                          The more I work on this (uninterrupted from day to day issues that I am NOT getting today, wooo!), the more I think I am "getting it."...I don't think we need ParseJob because what that did before was remove spaces in the job numbers that were lisited on Schedule, S. So I just need it to be rcell.value...about to code and see what happens.

                          puts on hard hat...

                          Here... Hold my beer?

                          garak0410G 1 Reply Last reply Reply Quote 1
                          • garak0410G
                            garak0410 @dafyre
                            last edited by

                            @dafyre said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                            @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                            @dafyre said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                            @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                            @dafyre said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                            @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                            In my weeks long struggle with this, I did at least try somethiing...I commented out all of the lines that grabbed the data from the other sheet (see code in posts above) and made a varient called rcell and tried this line of code:

                            For Each rcell In Worksheets("Sheet1").Range("W2:W50"): Debug.Print rcell.Value: Next rcell
                            sJob = rcell.Value

                            I keep getting SUBSCRIPT OUT OF RANGE.

                            I guess this is a lack of my own education mixed with bad coding in the first place...

                            A little formatting my help you see the problem...

                            For Each rcell In Worksheets("Sheet1").Range("W2:W50")
                             Debug.Print rcell.Value: 
                            Next rcell
                            
                            sJob = rcell.Value
                            

                            It looks like you're trying to assing sJob after you come out of the For Each loop... Try:

                            For Each rcell In Worksheets("Sheet1").Range("W2:W50")
                             Debug.Print rcell.Value: 
                             sJob = rcell.Value
                            
                            Next rcell
                            

                            OK...I am giving this a shot...I am at the point in the old code where I see when SJOB is equal to the value of the job on the date range on the other spreadsheet. Since I am moving these jobs to manually entered job numbers in Column W, will se how this works. Curretly, SJOB is equal to: sJob = ParseJob(GetValue(sSchedPath, "Schedule S.xls", "LOG (2)", "B" & CStr(l)))

                            sJob=ParaseJob(rcell.value) ?

                            The more I work on this (uninterrupted from day to day issues that I am NOT getting today, wooo!), the more I think I am "getting it."...I don't think we need ParseJob because what that did before was remove spaces in the job numbers that were lisited on Schedule, S. So I just need it to be rcell.value...about to code and see what happens.

                            puts on hard hat...

                            Here... Hold my beer?

                            Funny...it is amazing what a closed door and no distractions can do to your focus and clarity...and maybe "beer."... 🙂

                            dafyreD 1 Reply Last reply Reply Quote 0
                            • dafyreD
                              dafyre @garak0410
                              last edited by

                              @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                              @dafyre said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                              @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                              @dafyre said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                              @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                              @dafyre said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                              @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                              In my weeks long struggle with this, I did at least try somethiing...I commented out all of the lines that grabbed the data from the other sheet (see code in posts above) and made a varient called rcell and tried this line of code:

                              For Each rcell In Worksheets("Sheet1").Range("W2:W50"): Debug.Print rcell.Value: Next rcell
                              sJob = rcell.Value

                              I keep getting SUBSCRIPT OUT OF RANGE.

                              I guess this is a lack of my own education mixed with bad coding in the first place...

                              A little formatting my help you see the problem...

                              For Each rcell In Worksheets("Sheet1").Range("W2:W50")
                               Debug.Print rcell.Value: 
                              Next rcell
                              
                              sJob = rcell.Value
                              

                              It looks like you're trying to assing sJob after you come out of the For Each loop... Try:

                              For Each rcell In Worksheets("Sheet1").Range("W2:W50")
                               Debug.Print rcell.Value: 
                               sJob = rcell.Value
                              
                              Next rcell
                              

                              OK...I am giving this a shot...I am at the point in the old code where I see when SJOB is equal to the value of the job on the date range on the other spreadsheet. Since I am moving these jobs to manually entered job numbers in Column W, will se how this works. Curretly, SJOB is equal to: sJob = ParseJob(GetValue(sSchedPath, "Schedule S.xls", "LOG (2)", "B" & CStr(l)))

                              sJob=ParaseJob(rcell.value) ?

                              The more I work on this (uninterrupted from day to day issues that I am NOT getting today, wooo!), the more I think I am "getting it."...I don't think we need ParseJob because what that did before was remove spaces in the job numbers that were lisited on Schedule, S. So I just need it to be rcell.value...about to code and see what happens.

                              puts on hard hat...

                              Here... Hold my beer?

                              Funny...it is amazing what a closed door and no distractions can do to your focus and clarity...and maybe "beer."... 🙂

                              Is debug.print rCell.value showing anything in the immediate window (CTRL G or View -> Immediate window) ?

                              1 Reply Last reply Reply Quote 0
                              • garak0410G
                                garak0410 @Guest
                                last edited by

                                @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                                I'm making progress even if still getting errors...

                                I did put job numbers in rows W2 and W3. SJOB is still a null value even after this:

                                For Each rCell In Worksheets("REPORT").Range("W2:W50")
                                Debug.Print rCell.Value:
                                sJob = rCell.Value
                                Next rCell

                                And some how, it is still pulling data from Schedule, S and putting it in Column C...I am trying to track that down...

                                While debugging, it DOES pull from column W and I see SJOB being assigned a job number both by hovering over the variable and in the intermediate window. It then does the same for the next job number (only entered two for this example, cell W2 and W3. The intermediate Window does show both jobs:

                                0_1465916853111_vba10.jpg

                                But it is not holding the SJOB data as it eventually goes null...

                                When it gets to this part:

                                Function FindJobDir(ByVal strPath As String) As String
                                Dim sResult As String

                                sResult = Dir(strPath & "*", vbDirectory)
                                FindJobDir = UCase$(sResult)
                                Do While sResult <> ""
                                sResult = Dir
                                If Len(sResult) > 0 Then FindJobDir = FindJobDir & "," & UCase$(sResult)
                                Loop
                                End Function

                                It just starts grabbing all job folder information from the server location...luckily it fails when it hits a ZIP folder otherwise it would have been a data overrun...

                                When it is executing this line: vJobFolders = Split(FindJobDir(strpathtofile & sJob), ",")

                                SJOB Shows Null like this:

                                0_1465917979827_vba11.jpg

                                1 Reply Last reply Reply Quote 0
                                • dafyreD
                                  dafyre
                                  last edited by

                                  That is right. The way the code works, is it just prints the rcell.value to the screen, sets SJOB =rcell.value, and then at the Next rCell line, it goes to the next cell. It's not actually doing anything beneath that.

                                  The trick will be to comment out the "Next rCell" line

                                  and find out where the end of the process is, and then on the next line add next rCell and see if that works.

                                  If this thing is actively modifying files and such, I'd hightly recommend backing everything up before running it while you are working on that part. 🙂

                                  garak0410G 1 Reply Last reply Reply Quote 0
                                  • garak0410G
                                    garak0410 @dafyre
                                    last edited by

                                    @dafyre said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                                    That is right. The way the code works, is it just prints the rcell.value to the screen, sets SJOB =rcell.value, and then at the Next rCell line, it goes to the next cell. It's not actually doing anything beneath that.

                                    The trick will be to comment out the "Next rCell" line

                                    and find out where the end of the process is, and then on the next line add next rCell and see if that works.

                                    If this thing is actively modifying files and such, I'd hightly recommend backing everything up before running it while you are working on that part. 🙂

                                    Question...if I comment out the Next rCell line to test this, then what do I do with the FOR line? It will tell me there is a FOR without a NEXT.

                                    dafyreD 1 Reply Last reply Reply Quote 0
                                    • dafyreD
                                      dafyre @garak0410
                                      last edited by dafyre

                                      @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                                      @dafyre said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                                      That is right. The way the code works, is it just prints the rcell.value to the screen, sets SJOB =rcell.value, and then at the Next rCell line, it goes to the next cell. It's not actually doing anything beneath that.

                                      The trick will be to comment out the "Next rCell" line

                                      and find out where the end of the process is, and then on the next line add next rCell and see if that works.

                                      If this thing is actively modifying files and such, I'd hightly recommend backing everything up before running it while you are working on that part. 🙂

                                      Question...if I comment out the Next rCell line to test this, then what do I do with the FOR line? It will tell me there is a FOR without a NEXT.

                                      Yeah. You need to read through the code and figure out where to put that Next rCell statement.

                                      It is most likely near the end of the code... but look and see where it looks like everything is done, and put the Next statement there.

                                      garak0410G 1 Reply Last reply Reply Quote 0
                                      • garak0410G
                                        garak0410 @dafyre
                                        last edited by

                                        @dafyre said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                                        @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                                        @dafyre said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                                        That is right. The way the code works, is it just prints the rcell.value to the screen, sets SJOB =rcell.value, and then at the Next rCell line, it goes to the next cell. It's not actually doing anything beneath that.

                                        The trick will be to comment out the "Next rCell" line

                                        and find out where the end of the process is, and then on the next line add next rCell and see if that works.

                                        If this thing is actively modifying files and such, I'd hightly recommend backing everything up before running it while you are working on that part. 🙂

                                        Question...if I comment out the Next rCell line to test this, then what do I do with the FOR line? It will tell me there is a FOR without a NEXT.

                                        Yeah. You need to read through the code and figure out where to put that Next rCell statement.

                                        It is most likely near the end of the code... but look and see where it looks like everything is done, and put the Next statement there.

                                        Gotcha...call me nuts but this is kind of fun...learning a lot and trying not to get frustrated at this crazy code...

                                        dafyreD 1 Reply Last reply Reply Quote 0
                                        • dafyreD
                                          dafyre @garak0410
                                          last edited by

                                          @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                                          @dafyre said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                                          @garak0410 said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                                          @dafyre said in VBA Hint Needed - Change Way An Existing Project Grabs Data:

                                          That is right. The way the code works, is it just prints the rcell.value to the screen, sets SJOB =rcell.value, and then at the Next rCell line, it goes to the next cell. It's not actually doing anything beneath that.

                                          The trick will be to comment out the "Next rCell" line

                                          and find out where the end of the process is, and then on the next line add next rCell and see if that works.

                                          If this thing is actively modifying files and such, I'd hightly recommend backing everything up before running it while you are working on that part. 🙂

                                          Question...if I comment out the Next rCell line to test this, then what do I do with the FOR line? It will tell me there is a FOR without a NEXT.

                                          Yeah. You need to read through the code and figure out where to put that Next rCell statement.

                                          It is most likely near the end of the code... but look and see where it looks like everything is done, and put the Next statement there.

                                          Gotcha...call me nuts but this is kind of fun...learning a lot and trying not to get frustrated at this crazy code...

                                          Welcome to the life of software development! lol. I actually enjoy it too.

                                          1 Reply Last reply Reply Quote 0
                                          • garak0410G
                                            garak0410
                                            last edited by

                                            Yeah, this one will be a toughie because it won't even let me step through past a break-point with this error:
                                            0_1465927901497_vba12.jpg

                                            dafyreD 1 Reply Last reply Reply Quote 0
                                            • 1
                                            • 2
                                            • 3
                                            • 4
                                            • 1 / 4
                                            • First post
                                              Last post