    • scottalanmillerS
      scottalanmiller
      last edited by

      3z is awesome. We used them for a really long time in Toronto. Zero issues.

      1 Reply Last reply Reply Quote 0
      • scottalanmillerS
        scottalanmiller
        last edited by

        We never had any surprise costs with 3z. You pay the rate on the site.

        How much are you looking to house there?

        NashBrydgesN 1 Reply Last reply Reply Quote 0
        • NashBrydgesN
          NashBrydges @scottalanmiller
          last edited by

          @scottalanmiller Looking at 10U of rack space.

          scottalanmillerS 1 Reply Last reply Reply Quote 0
          • scottalanmillerS
            scottalanmiller @NashBrydges
            last edited by

            @NashBrydges said in Considering Colocation - What to watch for:

            @scottalanmiller Looking at 10U of rack space.

            Cool. Which DC? We used Front St and Mississauga.

            NashBrydgesN 1 Reply Last reply Reply Quote 0
            • NashBrydgesN
              NashBrydges @scottalanmiller
              last edited by NashBrydges

              @scottalanmiller Mississauga and Etobicoke are closer to me so they're obvious preferred choices. They also happen to be the less expensive of the 3 locations so that's a bonus. The Etobicoke location has pricing at $325 CDN for 10U which, frankly, is the cheapest I've seen from any colo.

              1 Reply Last reply Reply Quote 0
              • NerdyDadN
                NerdyDad
                last edited by

                One of the caveats is power consumption. We agreed up to 28 amps. If we stay under 28 amps, then we pay one price. If we go over 28 amps, then we have to pay a higher tiered price.

                1 Reply Last reply Reply Quote 0
                • jt1001001J
                  jt1001001
                  last edited by

                  Verify that the dimensions of the rack you are getting will hold your equipment!! We are running into an issue with our colocation facility where 2 of our older Dell's rails are deeper that the edge of the mounting rail and that smack right into the PDU's. If you need extended depth be sure to ask for it and GET IT IN WRITING ON THE CONTRACT before you sign.
                  That having been said, we are using Centrilogic for our colocation facility in Buffalo and they have been very accommodating even with our depth issue. They have 3 data centers in the GTA including Mississauga. I can get you contact info if you want it.

                  NashBrydgesN 1 Reply Last reply Reply Quote 1
                  • NashBrydgesN
                    NashBrydges @jt1001001
                    last edited by

                    @jt1001001 said in Considering Colocation - What to watch for:

                    Centrilogic

                    Ah, this is great, thanks. Would have never thought about checking for rack depth. If you have a contact I can talk to about getting quotes for the GTA area, yes, please PM me that info. Much appreciated!

                    1 Reply Last reply Reply Quote 0
                    • jt1001001J
                      jt1001001
                      last edited by

                      Having just completed our move a couple pointers:

                      1. Diagram your ideal layout, even if its a "stick Figure" drawing have some sort of guide
                      2. LENGTH OF POWERCABLES: Our power cables were WAY WAY WAY too long requiring us to do a lot of routing and rerouting, which in turn caused the back of the rack to be somewhat blocked which limits airflow. We are going to be purchasing short (2 and 3ft) lengths and redoing all the power.
                      3. LENGTH OF NETWORK CABLES: 6ft were too short in some cases, and 10FT were too long. We had to use more cable management which ends up wasting 2U of space. If you can, use some string and a tape measure on your existing racks to get an idea of how much length you'll need.
                      4. LABEL LABEL LABEL: In an ideal word, you put your stuff in the rack and never come back unless something breaks or its time to move to a new facility. Of course you are going to remember exactly what you did when you installed everything so when you come back 2 years later you remember exactly why that 1 server is in a separate switch port from the others. Take the time now to plan, and when installing label everything you can. This took a big chunk of our move window but will be worth it as I will be able to look and see which server that blue network cables goes to.
                      scottalanmillerS 1 Reply Last reply Reply Quote 3
                      • mlnewsM
                        mlnews
                        last edited by

                        Take photos of all of your gear inside and out. Put it in a file or on a wiki page. You'll want to be looking at a photo of it when talking to a tech someday. You'll thank me.

                        1 Reply Last reply Reply Quote 2
                        • scottalanmillerS
                          scottalanmiller @jt1001001
                          last edited by

                          @jt1001001 said in Considering Colocation - What to watch for:

                          Having just completed our move a couple pointers:

                          1. Diagram your ideal layout, even if its a "stick Figure" drawing have some sort of guide
                          2. LENGTH OF POWERCABLES: Our power cables were WAY WAY WAY too long requiring us to do a lot of routing and rerouting, which in turn caused the back of the rack to be somewhat blocked which limits airflow. We are going to be purchasing short (2 and 3ft) lengths and redoing all the power.
                          3. LENGTH OF NETWORK CABLES: 6ft were too short in some cases, and 10FT were too long. We had to use more cable management which ends up wasting 2U of space. If you can, use some string and a tape measure on your existing racks to get an idea of how much length you'll need.

                          Doesn't the DC handle all this for you? We've never provided cables of any sort or had access to look at the gear. Never mattered to us what length cables they chose to use or what the racking order was.

                          NerdyDadN travisdh1T 2 Replies Last reply Reply Quote 0
                          • NerdyDadN
                            NerdyDad @scottalanmiller
                            last edited by

                            @scottalanmiller said in Considering Colocation - What to watch for:

                            @jt1001001 said in Considering Colocation - What to watch for:

                            Having just completed our move a couple pointers:

                            1. Diagram your ideal layout, even if its a "stick Figure" drawing have some sort of guide
                            2. LENGTH OF POWERCABLES: Our power cables were WAY WAY WAY too long requiring us to do a lot of routing and rerouting, which in turn caused the back of the rack to be somewhat blocked which limits airflow. We are going to be purchasing short (2 and 3ft) lengths and redoing all the power.
                            3. LENGTH OF NETWORK CABLES: 6ft were too short in some cases, and 10FT were too long. We had to use more cable management which ends up wasting 2U of space. If you can, use some string and a tape measure on your existing racks to get an idea of how much length you'll need.

                            Doesn't the DC handle all this for you? We've never provided cables of any sort or had access to look at the gear. Never mattered to us what length cables they chose to use or what the racking order was.

                            Not all the time. Just yesterday, I went into my colo and racked & stacked my own servers, connected them up to power and network. They just provide us with physical security, a full rack, 2 independent sources of power w/ backups, and a network connection. We still have full control over everything else.

                            coliverC jt1001001J 2 Replies Last reply Reply Quote 0
                            • travisdh1T
                              travisdh1 @scottalanmiller
                              last edited by

                              @scottalanmiller said in Considering Colocation - What to watch for:

                              @jt1001001 said in Considering Colocation - What to watch for:

                              Having just completed our move a couple pointers:

                              1. Diagram your ideal layout, even if its a "stick Figure" drawing have some sort of guide
                              2. LENGTH OF POWERCABLES: Our power cables were WAY WAY WAY too long requiring us to do a lot of routing and rerouting, which in turn caused the back of the rack to be somewhat blocked which limits airflow. We are going to be purchasing short (2 and 3ft) lengths and redoing all the power.
                              3. LENGTH OF NETWORK CABLES: 6ft were too short in some cases, and 10FT were too long. We had to use more cable management which ends up wasting 2U of space. If you can, use some string and a tape measure on your existing racks to get an idea of how much length you'll need.

                              Doesn't the DC handle all this for you? We've never provided cables of any sort or had access to look at the gear. Never mattered to us what length cables they chose to use or what the racking order was.

                              It might depend on the setup inside the DC and/or how much space you're using. It doesn't make much sense for someone with 4u of space to go through all the security steps to get inside, where as a half or full rack could easily be secured separately making physical access less of a security risk for other clients.

                              ChrisLC 1 Reply Last reply Reply Quote 1
                              • coliverC
                                coliver @NerdyDad
                                last edited by

                                @NerdyDad said in Considering Colocation - What to watch for:

                                @scottalanmiller said in Considering Colocation - What to watch for:

                                @jt1001001 said in Considering Colocation - What to watch for:

                                Having just completed our move a couple pointers:

                                1. Diagram your ideal layout, even if its a "stick Figure" drawing have some sort of guide
                                2. LENGTH OF POWERCABLES: Our power cables were WAY WAY WAY too long requiring us to do a lot of routing and rerouting, which in turn caused the back of the rack to be somewhat blocked which limits airflow. We are going to be purchasing short (2 and 3ft) lengths and redoing all the power.
                                3. LENGTH OF NETWORK CABLES: 6ft were too short in some cases, and 10FT were too long. We had to use more cable management which ends up wasting 2U of space. If you can, use some string and a tape measure on your existing racks to get an idea of how much length you'll need.

                                Doesn't the DC handle all this for you? We've never provided cables of any sort or had access to look at the gear. Never mattered to us what length cables they chose to use or what the racking order was.

                                Not all the time. Just yesterday, I went into my colo and racked & stacked my own servers, connected them up to power and network. They just provide us with physical security, a full rack, 2 independent sources of power w/ backups, and a network connection. We still have full control over everything else.

                                The several colo's that we are looking at do exactly this. We rack our own equipment the only thing they provide is power and the physical rack.

                                1 Reply Last reply Reply Quote 1
                                • ChrisLC
                                  ChrisL @travisdh1
                                  last edited by

                                  @travisdh1 said in Considering Colocation - What to watch for:

                                  @scottalanmiller said in Considering Colocation - What to watch for:

                                  @jt1001001 said in Considering Colocation - What to watch for:

                                  Having just completed our move a couple pointers:

                                  1. Diagram your ideal layout, even if its a "stick Figure" drawing have some sort of guide
                                  2. LENGTH OF POWERCABLES: Our power cables were WAY WAY WAY too long requiring us to do a lot of routing and rerouting, which in turn caused the back of the rack to be somewhat blocked which limits airflow. We are going to be purchasing short (2 and 3ft) lengths and redoing all the power.
                                  3. LENGTH OF NETWORK CABLES: 6ft were too short in some cases, and 10FT were too long. We had to use more cable management which ends up wasting 2U of space. If you can, use some string and a tape measure on your existing racks to get an idea of how much length you'll need.

                                  Doesn't the DC handle all this for you? We've never provided cables of any sort or had access to look at the gear. Never mattered to us what length cables they chose to use or what the racking order was.

                                  It might depend on the setup inside the DC and/or how much space you're using. It doesn't make much sense for someone with 4u of space to go through all the security steps to get inside, where as a half or full rack could easily be secured separately making physical access less of a security risk for other clients.

                                  A lot goes into it, especially with compliancy--HIPAA/PCI/etc--but typically, we issue keycards to those with half-rack and more (if they want them), but they do need to inform us 24 hours in advance if they plan on coming in.

                                  1 Reply Last reply Reply Quote 3
                                  • TeleFoxT
                                    TeleFox
                                    last edited by

                                    Look out for the cross connects... they can be a pain. Need to make sure someone manages getting everything cross connected and have good communication with the data center. Where the carrier meets the data center can be awkward at times.

                                    1 Reply Last reply Reply Quote 0
                                    • jt1001001J
                                      jt1001001 @NerdyDad
                                      last edited by

                                      @NerdyDad thats how our colo is. The rent includes security (keycard access to DC, combiantion access to rack), rack, power feed, and Internet. Oh, and basic PDU's. We wanted more advanced PDU's (remote management and monitoring) which we could either lease from them or buy ourselves.

                                      1 Reply Last reply Reply Quote 0