CloudatCost - 50% off Upgrades - Limited Qty
-
@thanksajdotcom said:
Yeah, I bought a Dev1 upgrade earlier, but considering how new they are, it's not a great deal. The upgrade from Dev1 to Dev2 is as much as a brand-new Dev2 at 50% off. Considering we have a 60% coupon code for being Fruit Tarts, we are paying more to upgrade than buy the same thing new. This would advantageous if migrating or rebuilding was too demanding. However, given how new they are, I doubt any of us are at that point. Also, I didn't have any Dev1 servers to upgrade (I own a Dev2 and Dev3), so that was an oops on my part.
Are the posters on this forum called fruit tarts? That has serious negative connotations in the northeast (at least where I'm from).
-
@coliver As a grown, bearded, scotch drinking and lady chasing man I have no objections to being referred to as a fruit tart. I actually giggled at that
-
@thanksajdotcom said:
The upgrade from Dev1 to Dev2 is as much as a brand-new Dev2 at 50% off.
A Dev2 is $70 - 50% = $35
My upgrade from Dev1 to Dev2 was $35 - %50 = 17.50
How is that the same price?
-
@MattSpeller said:
@coliver As a grown, bearded, scotch drinking and lady chasing man I have no objections to being referred to as a fruit tart. I actually giggled at that
No, I have no problems being referred to as that. Just thought it was interesting. I find it to be a grin worthy name at worst.
-
@Aaron-Studer said:
@thanksajdotcom said:
The upgrade from Dev1 to Dev2 is as much as a brand-new Dev2 at 50% off.Wrong, Wrong, Wrong.
A Dev2 is $70 - 50% = $35
My upgrade from Dev1 to Dev2 was $35 - %50 = 17.50
How is that the same price?
I was thinking of upgrading my Dev1 - Dev3 for 50$... not sure if I will need that computing power though.
-
@coliver said:
@Aaron-Studer said:
@thanksajdotcom said:
The upgrade from Dev1 to Dev2 is as much as a brand-new Dev2 at 50% off.Wrong, Wrong, Wrong.
A Dev2 is $70 - 50% = $35
My upgrade from Dev1 to Dev2 was $35 - %50 = 17.50
How is that the same price?
I was thinking of upgrading my Dev1 - Dev3 for 50$... not sure if I will need that computing power though.
I use a Dev3 for my Plex servwr. -
unless you have something on a server that simply cannot be migrated or just done again, it is pretty silly to upgrade a C@C server really.
-
@JaredBusch said:
unless you have something on a server that simply cannot be migrated or just done again, it is pretty silly to upgrade a C@C server really.
Ditto this.
-
Just upgraded a Dev3 to a BigDog2, and the coupon still works!
-
25 days ago....silly.
Today...totally worth it.
lulz