@scottalanmiller said:
@Dashrender said:
Is it, or is it not using a 10 GbE switch (or two) to connect all of the equipment?10GigE Dell switch on ours for the backplane. It's a dedicated node communications channel, not open to the LAN, which is also 10GigE.
Is there a redundant switch in the backplane?
-
@coliver said:
@scottalanmiller said:
@Dashrender said:
Is it, or is it not using a 10 GbE switch (or two) to connect all of the equipment?10GigE Dell switch on ours for the backplane. It's a dedicated node communications channel, not open to the LAN, which is also 10GigE.
Is there a redundant switch in the backplane?
Not at the moment on ours, but normally yes of course.
-
Beginning more formal testing with the cluster now. Running through Citrix documentation on it. Time to move past the "fun" testing into more serious stuff. LOL
-
So much activity, this thing is really filling up with VMs quickly!
-
We are getting more opportunity to run this cluster through its paces as I start working on the Linux Admin Guide on it.
-
Just found out that all of the gear is, indeed, moving to a US-based datacenter. Which one, I don't know yet, but hopefully will find out this week.
-
@scottalanmiller said:
Just found out that all of the gear is, indeed, moving to a US-based datacenter. Which one, I don't know yet, but hopefully will find out this week.
Too bad you don't want it UK based, I could have got you a deal here
-
@NattNatt said:
Too bad you don't want it UK based, I could have got you a deal here
What kind of facilities do you have over there?
-
@scottalanmiller said:
@NattNatt said:
Too bad you don't want it UK based, I could have got you a deal here
What kind of facilities do you have over there?
From co-lo to full hosting, we have several options available with different benefits etc - including live-scalable type environments etc
-
@NattNatt said:
From co-lo to full hosting, we have several options available with different benefits etc - including live-scalable type environments etc
We have so much gear that we could easily populate a second facility, too bad it is so costly to ship gear from the US to the UK.
-
@scottalanmiller said:
@NattNatt said:
From co-lo to full hosting, we have several options available with different benefits etc - including live-scalable type environments etc
We have so much gear that we could easily populate a second facility, too bad it is so costly to ship gear from the US to the UK.
hah well If you ever decide to have it multi-location get in touch and yeah, we have lots of space in our DC's for expansion!
-
Get us some space, maybe we will accumulate some capacity over here, too.
-
@NattNatt said:
hah well If you ever decide to have it multi-location get in touch and yeah, we have lots of space in our DC's for expansion!
oooo, who are you
-
@Breffni-Potter said:
@NattNatt said:
hah well If you ever decide to have it multi-location get in touch and yeah, we have lots of space in our DC's for expansion!
oooo, who are you
Hah a lowly tech that works in a big hosting company based in the UK
-
The next three nodes are on their way now! The first three nodes were the SATA tier. We have an SSD tier coming now as well.
-
@scottalanmiller said:
The next three nodes are on their way now! The first three nodes were the SATA tier. We have an SSD tier coming now as well.
Ahhhh... to have a budget for such things must be nice.
-
I was hot and heavy for Scale.
Fast forward a month and now I'm neck-deep in planning a from-scratch VSAN cluster.
The doesn't-want-to-administer-vmware side of me is lusting for Scale, but the government-pricing-means-vsan-is-practically-free side of my boss trumps all.
-
Should I add... second 10GigE switch coming too.
-
-
We are using Dells. @art_of_shred or @Mike-Ralston would have to tell you which models, they have physical access to them.